Langley Court
Updated: 6 March 2024
Location: Beckenham
Developer: Cala
Number of units: 4 houses
Aim(s) of Project: Full electric trial - Wondrwall equipment installed throughout.
Construction method: Masonry
Energy Compliance method: SAP 2012
Overheating compliance method: NA
Construction start: May 2021
Construction finish: January 2024
Cala have trialed these masonry constructed houses with the Wondrwall infra-red panel heating system which comes with smart controls. Immersion heaters are used for the hot water. There are no batteries.
The aim of the project is to investigate the use of infra-red panels with smart controls as a means all electric heating.
Not applicable